Bored Piles

Flight auger piling requires the control of parameters in real time in order to ensure that the pile has been correctly carried out.
Real time information is needed on concrete pressure and volume, over-consumption of concrete, mast verticality, and depth.
Indeed, the risks involved with such piles are either the cutting of the pile because of an accidental lack of concrete or too much pressure in the soil, or the extravagant overconsumption of concrete.
In continuous flight auger piling (CFA), the TARALOG is the measuring device.
The measured parameters in the drilling phase are depth, rotation (RPM), torque pressure, and mast inclination.
The measured parameters in the concrete phase are concrete flow and volume, concrete pressure etc.
The TARALOG has a graphic screen. It develops the pile profile in real time, as it is being done, in order to help the driller keep to the limits of pressure and overconsumption of concrete.
These recorded parameters are edited onto the computer to develop the pile log.
The TARALOG can also be installed on cranes with swinging leads.
Grouting

In low pressure grouting techniques, instrumentation for improving or strengthening the soil ensures the following points,
including the measurement of parameters in every grouting line: pressure, flowrate, and volume.
The finding out of grouting conditions, especially the injected volume.
Automatic control of the pumps in order to stop the grouting process at defined criteria: maximum pressure, volume or GIN method. This method combines the values of pressure and injected volume in order to decide when the grouting is finished. Finally, it is necessary to have software at one's disposal in order to be able to easily assess, sort out and analyze grouting results.
We offer a complete range of equipment including a single pump up to twelve pumps.
Our robust instrumentation is well-equipped for all your measuring, recording, and automation needs during this process. Our real-time
graphic recordings and software reports provide you with this information while the work is still in
progress.
|